■ Basic Information
| Location | All |
| Charging Interfaces | One Pile with One Charge |
| Start Mode | APP Control, Book charging, Remote Control, RFID Card |
| Function | Screen Display |
| IP Rating | IP32 |
| Certification | CE, ISO, TUV, RoHS, FCC |
| Application | Home Use / Commercial |
| Output Power | 20kw |
| Leakage Protection | A/A+6 |
| Keyword | EV Charger Station |
| Interface Standard | Gbt |
| Specification | 632*630*320 mm |
| Origin | China |
■ Technical Specifications
| Standard | CCS 2 / GBT |
| Product Model | JR series |
| Size | 320*630*632mm |
| Voltage | 400Vac±15% / 380Vac±15% |
| Power / Amperage | 20kW (50A) / 30kW / 40kW (100A) |
| Installation Method | Indoor/Outdoor / Movable |
| Multiple Protection | Ground, leakage, over-voltage, over-current, over-temperature, lightning protection |
| Enclosure Material | PC |
| Operating Temp | -25℃ to +50℃ (Operating) |
| IP Rating | IP32 |
| Display | 4.3 inch screen |
Request Full Catalog & Detailed Specifications
■ Production & Quality Control
■ Frequently Asked Questions
Are you a manufacturer or a trading company?
We are a professional EV charging station manufacturer with over 9 years of industry experience, specializing in new energy solutions.
What are your production capabilities?
We operate a 6000 square meter workshop with 6 automatic/semi-automatic production lines, supported by a 20+ member R&D team and 60+ patent certificates.
What is the typical delivery time?
Generally, delivery takes between 3 to 25 days after receiving advance payment, depending on the specific items and order quantity.
Can I customize the product with my own logo?
Yes, we provide extensive customization services including LOGO, color, cable length, enclosure box, and carton packaging.
How long does it take to fully charge an electric car?
Charging time = Battery capacity (kWh) / Power (kW). For example, a 40kWh battery charged with a 7kW OBC will take approximately 5.7 hours to fully charge.
Do you test the chargers before they are shipped?
Yes, all major components undergo testing before assembly, and every individual charger is fully tested for safety and performance before shipment.